City of Melton

More information:

Do I need a Permit?

Setting up fences in Melton homes needs a building permit under the following conditions:

  • Fence exceeds 2.0 metres, regardless of material or location*
  • Fence exceeds 1.5 metres if located within 3.0 metres of a street and is built with lightweight materials (e.g., timber)*
  • Fence exceeds 1.2 metres if located within 3.0 metres of a street and is built with masonry materials (e.g., brick, concrete)*
  • Corner fence exceeds 1.0 metre if within 9.0 metres of an intersection
  • Fence contains barbed wire and sharp protrusions and is next to the street*
  • Fence forms part of the pool barrier, regardless of specifications

Request a Free Quote

*Applies to front and boundary fencing

Building permit application costs start at AUD$220.50 for projects that cost AUD$10,000 or less. This is within the ballpark for most fencing projects.